The Formula 1 British Grand Prix Is out of the Pits With Rhinopatch
The last Formula 1 British Grand Prix to be held at Silverstone had to be a show stopping event. The safety, quality and speed of the track is always of paramount importance to the drivers and teams and with minor irregularities noted on track test days, ASI Solutions were called in to ensure the […]
M40 Leads the Charge With Rhinophalt Sustainability
UK Highways M40 Ltd has placed the first order of a 5 year contract for the preservation of the M40. The M40 contract commenced in June 2008 and is being undertaken by Enterprise plc, a delivery partner of ASI.
Annual Local Authority Road Maintenance (ALARM Survey)
The 2008 ALARM Survey is the 13th report to be published and reports on shortfall in road structural budget of over £1 billion across England and Wales. For the first time it includes figures on the number of road openings by utility companies. These have increased from just over 2 million last year to nearly 2.5 million across England and Wales …
Testimonial
Rhinopatch takes all the heavy lifting out of the operation.
Rhinopatch user John Oldham, Operative, Sheffield City Council
